So far we've passed each of the inspections - last week was HVAC and plumbing. This week is electrical. Here's how they let you know that you passed - they leave you post-it notes on the windows. Thanks mystery post-it note leaver!
Also, we got to the house yesterday to see our fire box was delivered and installed. This is a wood burning fireplace. Pretty cool!
Here's a peak inside...

Sunday, August 24, 2008
Inspections passed and fire box is in!
Posted by Allison at Sunday, August 24, 2008 1 comments
Sunday, August 17, 2008
Saturday, August 16, 2008
Appliances
We've selected our kitchen appliances and are pretty excited about it. For those who visited our "before" house, you'll see these are a major upgrade from our mini kitchen with apartment-grade appliances. In addition to giving our meal preparation a much needed boost (these probably don't set off the smoke alarm when you bake a pizza:), they look cool too!
Posted by Allison at Saturday, August 16, 2008 1 comments
Friday, August 15, 2008
The things you just don't think of...
Mike met with the builder today for our weekly meeting and discovered that most of our electrical outlets will live in the baseboards. I think it's a pretty cool idea but can certainly say it wasn't something that I would have ever thought of. It seems like we've come up against a lot of these types of situations throughout this building process (flashback to the cabinet molding:).
Posted by Allison at Friday, August 15, 2008 0 comments
Sunday, August 10, 2008
Can you see the coffered ceiling?
We're putting in a coffered ceiling in the great room/living room/front room - not sure what we're calling this room. Here's the beginning of it being built...
And when it is done, it'll look similar to this...

Posted by Allison at Sunday, August 10, 2008 1 comments
Bath tubs and showers
We got caught up on some house activity during our visit yesterday - in particular, in the bathrooms. In addition to rough plumbing and HVAC work, the spare bath tub was installed and is in the midst of a water test...
...Our master bath tub will go here once it arrives. (I'm not sure what this means but thought the contractor-to-plumber code-speak was interesting.)
...And here's Mike checking out the body jets in the master bath shower.

Posted by Allison at Sunday, August 10, 2008 1 comments
Rough plumbing and HVAC
Here are a few pics from yesterday after seeing what the plumbing and heating ducts look like in the walls...


Posted by Allison at Sunday, August 10, 2008 0 comments
Wednesday, August 6, 2008
What’s going on at the house this week?
Sorry for our absence. There actually has been activity at the house this week but not necessarily picture worthy. Here’s what’s up…
Posted by Allison at Wednesday, August 06, 2008 1 comments
Sunday, August 3, 2008
2nd floor framing
On Friday we were able to get upstairs for the first time, which was really cool. Here are a few pics showing the framing...